Decontamination/ Shower Trailers
Rental Locations:
New Zealand: Auckland & Christchurch | Contact Us for Additional Availability Across New Zealand!
Showing all 2 results
-
DFDECONUNIT3The 3 Stage (2 x Shower) Skid Mounted Decontamination Unit provides a structured three-stage personnel decontamination setup with two dedicated shower cells. The system combines demountable aluminium cubicles, hot and cold water supply, pumped water pressure, dual wastewater filtration, and privacy doors on a skid-mounted frame for practical site deployment.
- Three-stage decontamination system with two shower stages
- Three demountable cubicles fabricated from heavy-duty aluminium sheeting
- High-gloss white powder-coated cubicle finish
- 400 L skid-mounted hot water unit with hot and cold water manifold
- Dual wastewater filter system provides increased filtration capacity
- Privacy doors fitted at the dirty-side entrance and clean-side exit
DFDECONUNIT3The 3 Stage (2 x Shower) Skid Mounted Decontamination Unit provides a structured three-stage personnel decontamination setup with two dedicated shower cells. The system combines demountable aluminium cubicles, hot and cold water supply, pumped water pressure, dual wastewater filtration, and privacy doors on a skid-mounted frame for practical site deployment.- Three-stage decontamination system with two shower stages
- Three demountable cubicles fabricated from heavy-duty aluminium sheeting
- High-gloss white powder-coated cubicle finish
- 400 L skid-mounted hot water unit with hot and cold water manifold
- Dual wastewater filter system provides increased filtration capacity
- Privacy doors fitted at the dirty-side entrance and clean-side exit
-
DFDECON4
- Suitable for lead paint projects with 6-20 men
- Has four showers, an airlock and larger change room.
- Has separate 'Dirty' entrance chamber and 'Clean' exit chamber
- Waste water filtration system and hot and cold showers
- A/C and heating Systems
- 'Dirty' room has HEPA (lead rated) negative air filtration
DFDECON4- Suitable for lead paint projects with 6-20 men
- Has four showers, an airlock and larger change room.
- Has separate 'Dirty' entrance chamber and 'Clean' exit chamber
- Waste water filtration system and hot and cold showers
- A/C and heating Systems
- 'Dirty' room has HEPA (lead rated) negative air filtration

